Ground-Breaking Ceremony for Myande’s New Grain & Oil and Energy-saving Equipment Manufacturing Base
Ground-Breaking Ceremony for Myande’s New Grain & Oil and Energy-saving Equipment Manufacturing Base
Ground-Breaking Ceremony for Myande’s New Grain & Oil and Energy-saving Equipment Manufacturing Base
Nov 2, 2022

Recently, the grand ground-breaking ceremony for Myande’s new Grain & Oil and Energy-saving Equipment Manufacturing Base" was held in the East Park of Myande Group. Xu Bin, Chairman of Myande Group, and Wang Mu, Vice Chairman of Myande Group, together with all employees, attended the ceremony.


Chairman Xu Bin made a brief introduction to the project: It’s a Grain & Oil and Energy-saving Equipment Manufacturing Base with the construction policy of "low-carbon environmental protection, clean and dust-free, rational layout, intelligent and efficient", by massive use of digital manufacturing equipment and testing instruments, to realize One Piece Flow Production; At the same time, adopting robot system, high-power laser cutting system and AGV intelligent logistics system, to preliminarily realize intelligent manufacturing and digital integration in combination with digital transformation.
Product Catalog